+86-23-88901306   sales@topoilpurifier.com
Transformer On-Load Voltage Regulation Switch Tester OLTC-2000
Home » Products » Electrical Instrument » Transformer Testers » Transformer On-Load Voltage Regulation Switch Tester OLTC-2000

Category List

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Transformer On-Load Voltage Regulation Switch Tester OLTC-2000

  • OLTC-2000

  • TOP OIL PURIFIER

Availability:
Quantity:

Product Description

Introduction

The tester can record switch operation waveform in overall process. The longest time is 6.4s.It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically. It has power-off protection, over-voltage protection, perpetual clock and high-speed printing.

 

Technique parameters

1.Three way independent test power, the maximum output current is 0.5A.

2.Processing part: 80C320 high speed 8 digit microprocessor High speed A/D converter, the 3.Maximum sampling rate can reach 400KHz

4.Tester set sampling rate:10~20KHz

5.Maximum save time of single waveform:6.4s

6.Transition resistance measuring scope:0~40Ω

7.Measuring precision:△≦10%

8.Power supply: 220V±10% power:200W

9.Size: 410mmx320mmx260mm

10.Weight: 20kg


Previous: 
Next: 

ABOUT US

Chongqing TOP Tester Co.,LTD belongs to Chongqing TOP Group which is located at Chongqing city--a southwest electromechanical manufacturing center as well as national municipality. We are a sci-tech enterprise and integrate development, design and manufacture. 

QUICK LINKS

PRODUCT CATEGORY

GET IN TOUCH

  No. 1, Jianlong N. Rd., Jiulongpo District,Jiulong Industrial Park,  Chongqing, China

  sales@topoilpurifier.com

  +86-13983391036 

  topoilpurifier

 +86-13983391036

Copyright © 2021 Chongqing TOP Tester Co., Ltd. Sitemap